THE ‘WALKIE TALKIE’ BUILDING LONDON WATER TANK INSTALLATION
Home » Case Studies » Walkie Talkie Building London
grp sectional tank installation
In July 2012, Tricel Weston successfully delivered a water tank installation project for an office tower in London. The installation included four tanks of varying sizes: Tank 1 measured 9 x 6 x 3 metres with a capacity of 162,000 litres, Tank 2 was 7 x 6 x 3 metres holding 126,000 litres, while Tanks 3 and 4 were both 2 x 2 x 2 metres with capacities of 8,000 and 6,000 litres respectively. The project catered to the water storage needs of a large commercial building within the office sector.
The Challenge
The construction of 20 Fenchurch Street, famously known as the ‘Walkie Talkie’ building, introduced several engineering challenges. Its top-heavy structure and 160-meter height required an efficient and reliable water storage system. To meet these demands, the solution needed to integrate seamlessly with the building’s unique design while ensuring a consistent filtered water supply.
Tricel’s Comprehensive Solution
Addressing these challenges required a turnkey approach. Our team managed the entire process, including supply, delivery, offloading, positioning, and installation. The project involved four GRP hot press sectional water tanks, along with levelling steels, intricate connections, ladders, and guardrails. Through careful planning and execution, the tanks were securely installed without compromising the building’s architectural integrity.
Beyond installation, efficiency and reliability remained our priorities. By collaborating closely with project managers, we ensured that the filtered water supply tank system met the highest safety and performance standards.
The Final Result – A Reliable grp sectional tank installation for a Landmark Building
The successful installation included four tanks with varying capacities:
- 162,000 litres
- 126,000 litres
- 8,000 litres
- 6,000 litres
This GRP sectional tank installation provided a dependable filtered water supply throughout the skyscraper, effectively meeting its diverse water storage needs.
By leveraging our expertise, Tricel played a key role in enhancing the Walkie Talkie building’s infrastructure. The result? A high-quality, long-lasting filtered water supply tank system that supports the functionality of this iconic London landmark.
Need a water storage solution? Contact us today!
Read More...
- Water Tank Installation & Maintenance
- Cold Water Storage Tanks
- Case Studies
Cold Water Tank Sizing: How to Calculate Storage Volume for Multi-Storey Buildings
A technical guide to cold water tank sizing methodology for multi-storey buildings — covering demand estimation, resilience calculations, water age, Legionella risk, and a worked sizing example.
Confined Space Entry in Building Maintenance: Obligations and Safe Systems
A practical guide to confined space entry obligations for building maintenance teams and contractors — covering the Confined Spaces Regulations 1997, permit to work, atmospheric testing, standby arrangements, and cold water tank entry.
Backflow Prevention in Building Water Systems: Fluid Categories and Device Selection
A technical guide to backflow prevention under the Water Fittings Regulations — fluid categories 1 to 5, device types for cold water cisterns, the Type AG air gap requirement, and common compliance failures.
Cold Water System Commissioning: Cleaning and Disinfection to BS EN 806-5
A practical guide to cold water system commissioning, cleaning, and disinfection in line with BS EN 806-5. Covers procedure, chlorination residuals, flushing, clearance for service, and handover documentation.