Tricel Water Achieves SafeContractor Approval for 2025–2026
Home » Water Industry Insights & Innovations » Tricel Water Achieves SafeContractor Approval for 2025–2026
Tricel Water Achieves Safe Contractor Approval for 2025–2026
At Tricel Water, safety, compliance, and quality are at the heart of everything we do. We are proud to announce that Tricel (Water) Ltd has been awarded Safe Contractor approved, a leading health and safety accreditation from Alcumus.
This certification, valid from 22nd July 2025 to 26th July 2026 (Certificate No. WO0995), recognises our commitment to meeting the highest standards in health and safety management across our operations.
What is SafeContractor Approved?
SafeContractor is a nationally recognised accreditation scheme that provides a benchmark for health and safety compliance in the UK. It is part of the SSIP (Safety Schemes in Procurement) framework, meaning accredited contractors meet strict assessment standards set across the industry.
By achieving SafeContractor status, Tricel Water has demonstrated:
Robust health and safety documentation and processes
Compliance with industry standards under the Contractors Health and Safety Assessment Scheme (CHAS)
A proven track record of operating safely in high-risk environments
Our Accredited Work Categories
As part of our SafeContractor certification, Tricel Water is approved to carry out:
Tank Installation & Maintenance
Water Tower & Tank Construction
These services require both technical expertise and strict safety practices. Projects such as installing GRP water tanks or constructing water towers often involve challenging conditions, including:
Confined Spaces – requiring specialist entry and monitoring procedures.
Tower Scaffolds – demanding careful planning, risk assessments, and trained operatives.
Working at Height – where fall prevention systems and rigorous checks are essential.
Why This Matters to Our Customers
For our clients, including contractors, consultants, sprinkler companies, and facilities managers, this accreditation provides reassurance that:
We operate to independently verified safety standards
Our teams are trained and competent to work in challenging environments
Projects are delivered with a focus on safety, reliability, and compliance
Whether installing a one-piece GRP water tank, a sectional tank, or a fire sprinkler tank, our customers can trust Tricel Water to deliver with safety at the forefront.
A Commitment to Quality and Safety
This accreditation underlines Tricel Water’s ongoing commitment to maintaining the highest standards of safety, professionalism, and customer confidence. It demonstrates that our business not only meets but exceeds industry expectations for safe working practices.
By securing SafeContractor approval, we further reinforce our position as a trusted UK supplier of GRP water storage solutions, including one-piece tanks, sectional tanks, and fire sprinkler tanks. Our clients can be assured that every project is delivered with reliability, compliance, and a strong focus on long-term quality.
Ultimately, SafeContractor accreditation gives our customers peace of mind that they are working with a supplier who places safety and trust at the centre of every installation.
Read More...
- Water Tank Installation & Maintenance
- Cold Water Storage Tanks
- Case Studies
Cold Water Tank Sizing: How to Calculate Storage Volume for Multi-Storey Buildings
A technical guide to cold water tank sizing methodology for multi-storey buildings — covering demand estimation, resilience calculations, water age, Legionella risk, and a worked sizing example.
Confined Space Entry in Building Maintenance: Obligations and Safe Systems
A practical guide to confined space entry obligations for building maintenance teams and contractors — covering the Confined Spaces Regulations 1997, permit to work, atmospheric testing, standby arrangements, and cold water tank entry.
Backflow Prevention in Building Water Systems: Fluid Categories and Device Selection
A technical guide to backflow prevention under the Water Fittings Regulations — fluid categories 1 to 5, device types for cold water cisterns, the Type AG air gap requirement, and common compliance failures.
Cold Water System Commissioning: Cleaning and Disinfection to BS EN 806-5
A practical guide to cold water system commissioning, cleaning, and disinfection in line with BS EN 806-5. Covers procedure, chlorination residuals, flushing, clearance for service, and handover documentation.