We value your privacy

Our website uses cookies to enhance your experience. By continuing to use our website, you are agreeing to our use of cookies. Necessary cookies are always enabled. You can read more about our Cookie Policy in our Privacy policy

We value your privacy

Cookies are small text files stored on your computer by websites you visit. They help users navigate websites efficiently and enable certain essential functions. Cookies necessary for the website to function properly can be set without your consent, while all other cookies require your approval before being used in your browser.

Additionally, we use cookies to gather data for personalizing and evaluating the effectiveness of our advertising. For more information, please refer to the Google Privacy Policy.

You can find the list of all the cookies that we use on our website here.
Futuristic skyscraper architecture in a bustling urban city setting.

THE ‘WALKIE TALKIE’ BUILDING LONDON WATER TANK INSTALLATION

Futuristic skyscraper architecture in a bustling urban city setting.

grp sectional tank installation

In July 2012, Tricel Weston successfully delivered a water tank installation project for an office tower in London. The installation included four tanks of varying sizes: Tank 1 measured 9 x 6 x 3 metres with a capacity of 162,000 litres, Tank 2 was 7 x 6 x 3 metres holding 126,000 litres, while Tanks 3 and 4 were both 2 x 2 x 2 metres with capacities of 8,000 and 6,000 litres respectively. The project catered to the water storage needs of a large commercial building within the office sector.

The Challenge

The construction of 20 Fenchurch Street, famously known as the ‘Walkie Talkie’ building, introduced several engineering challenges. Its top-heavy structure and 160-meter height required an efficient and reliable water storage system. To meet these demands, the solution needed to integrate seamlessly with the building’s unique design while ensuring a consistent filtered water supply.

Tricel’s Comprehensive Solution

Addressing these challenges required a turnkey approach. Our team managed the entire process, including supply, delivery, offloading, positioning, and installation. The project involved four GRP hot press sectional water tanks, along with levelling steels, intricate connections, ladders, and guardrails. Through careful planning and execution, the tanks were securely installed without compromising the building’s architectural integrity.

Beyond installation, efficiency and reliability remained our priorities. By collaborating closely with project managers, we ensured that the filtered water supply tank system met the highest safety and performance standards.

The Final Result – A Reliable grp sectional tank installation for a Landmark Building

The successful installation included four tanks with varying capacities:

  • 162,000 litres
  • 126,000 litres
  • 8,000 litres
  • 6,000 litres

This GRP sectional tank installation provided a dependable filtered water supply throughout the skyscraper, effectively meeting its diverse water storage needs.

By leveraging our expertise, Tricel played a key role in enhancing the Walkie Talkie building’s infrastructure. The result? A high-quality, long-lasting filtered water supply tank system that supports the functionality of this iconic London landmark.

Need a water storage solution? Contact us today!

Read More...

  • Water Tank Installation & Maintenance
  • Cold Water Storage Tanks
  • Case Studies
Leak in Water Tank

Leak in Water Tank: Causes, Prevention, and Solutions

April 3, 2025

​Water tank leaks can lead to significant structural damage and water loss. Common causes include corrosion, poor installation, and lack of maintenance. To prevent leaks, it's essential to ensure proper installation, use high-quality materials, and conduct regular inspections. For detailed guidance on causes, prevention, and solutions for water tank leaks, refer to Tricel Water UK's comprehensive article.​

Importance of Base Levelling Steels

May 2, 2024

Proper base levelling is essential for the stability and longevity of your water tank. This guide explains why base levelling steels are crucial for preventing structural issues and ensuring your tank performs optimally over time.

Water Tank Replacement

February 16, 2024

Replacing your water tank is crucial for maintaining system efficiency and preventing costly repairs. This guide covers key signs that it’s time for a replacement and the best practices for installing a new tank, ensuring reliable water storage.

Installing a Sectional Water Tanks

Water Tank Installation Guidelines

September 13, 2023

Ensure your water tank is installed correctly with our comprehensive guide. Learn the key steps, best practices, and important considerations to achieve a successful and efficient installation.

up