Water Storage Solutions for the UK’s Largest Infrastructure Project
Tricel Water designed, manufactured, and installed two large GRP water tanks (8 m × 7 m × 4 m) for HS2’s Greatworth Green and Chipping Warden Green Tunnel projects. A third tank is planned for early 2026, continuing Tricel Water’s key role in the Green Tunnel programme.