Summary
In 2025, Tricel Water was appointed by Scottish Water Business Stream (SWBS) to design, manufacture and install two large GRP water storage tanks at Murrayfield Stadium.
The project came with strict timescales. A major stadium event was scheduled for 5 November 2025, requiring guaranteed readiness before that date. Multiple stakeholders and detailed technical requirements added further complexity to the programme.
Through close collaboration with Mott MacDonald, streamlined communication between all parties and rapid mobilisation of Tricel Water’s manufacturing and installation teams, both tanks were successfully installed ahead of deadline.
The completed project delivered full compliance with safety and performance standards and received positive feedback from SWBS and consultants.
Project Information
At a Glance
Murrayfield Stadium required two large potable water storage tanks to support increased demand and ensure full compliance with performance and safety requirements.
Sports & Leisure Facilities
Tricel Water was appointed to design, manufacture and install the two large GRP water storage tanks.
The client required two large GRP sectional potable water storage tanks, each measuring 11m × 3m × 3m.
The project involved the design, manufacture and installation of two GRP water storage tanks at Murrayfield Stadium.
The project challenges identified in the original case study were a tight programme deadline, complex stakeholder coordination, a competitive tender environment and contractual risk.
2025 –Tricel Water appointed for 2 GRP tanks.
Q3 2025 – Both tanks installed ahead of the deadline.
5 November 2025 – Guaranteed readiness before a major stadium event.
The completed project achieved full compliance with safety and performance standards and received positive feedback from SWBS and consultants.
Project Background
Water Tank Installation for a High-Demand Stadium Facility
In 2025, Tricel Water was appointed by Scottish Water Business Stream to design, manufacture and install two large GRP water storage tanks at Murrayfield Stadium in Edinburgh.
The stadium required two large potable water storage tanks to support increased demand while ensuring full compliance with performance and safety requirements.
The programme was particularly important. A major stadium event was scheduled for 5 November 2025, and the client required guaranteed readiness before that date.
The project also involved multiple stakeholders and detailed technical requirements. Design support was provided by Mott MacDonald’s Manchester and Aberdeen offices, while the project itself was tendered through Scottish Water Business Stream.
Through close collaboration, streamlined communication and rapid mobilisation of the manufacturing and installation teams, Tricel Water successfully installed both tanks ahead of deadline.
Delivery Approach
Tricel's Engineering and Delivery Approach
Delivering the Murrayfield Stadium water storage project required speed, technical coordination and control across design, manufacturing and installation.
Rapid Design Approval & DWG Updates
The project required a quick turnaround from design approval through to installation.
Rapid design approval and DWG updates formed part of Tricel Water’s solution, supporting the project’s demanding programme.
Full Manufacturing Control
One of the client’s requirements was a supplier with full manufacturing control and the ability to support detailed technical submissions.
Tricel Water was responsible for the manufacture of both large GRP sectional tanks as part of the overall project delivery.
Fast-Tracked Manufacturing & Installation
With only weeks available to design, manufacture and install both tanks, the manufacturing and installation programme was fast-tracked.
Rapid mobilisation helped ensure the two potable water storage tanks were installed ahead of the required deadline.
Stakeholder Coordination
The project involved multiple stakeholders and consultant offices.
Tricel Water worked closely with Mott MacDonald, with design support provided by its Manchester and Aberdeen offices. Streamlined communication across the project teams supported efficient delivery.
Time-Critical Delivery
The client required guaranteed readiness ahead of the major stadium event scheduled for 5 November 2025.
Both tanks were successfully installed ahead of deadline.
The Brief
Understanding the Challenge
The Murrayfield Stadium potable water storage project presented four principal challenges.
•Tight Programme: There were only weeks available to design, manufacture and install both GRP water storage tanks.
•Stakeholder Coordination: Multiple consultant offices required updated designs, creating a need for close coordination throughout the project.
•Competitive Tender Environment: The project was delivered within a competitive tender environment and was tendered through Scottish Water Business Stream.
•Contractual Risk: The original case study records that a delivery commitment could only be made once the client confirmed the order.
“Tricel’s involvement from design stage ensured quality and timely delivery.”
— Client Feedback, Murrayfield Stadium Edinburgh
Programme
Timeline
Two 11m × 3m × 3m GRP sectional potable water storage tanks installed at Murrayfield Stadium following a fast-tracked design, manufacturing and installation programme.
Project delivered ahead of deadline through rapid design approval, DWG updates and coordination between Tricel Water, Scottish Water Business Stream and Mott MacDonald.
Potable water storage infrastructure fully delivered — supporting stadium demand, with positive feedback from SWBS and consultants on project quality and timely delivery.
Outcome
A Time-Critical Water Storage Project
Both large GRP water storage tanks were successfully installed ahead of the required deadline.
The final project results recorded full compliance with safety and performance standards.
Rapid design approval, DWG updates and seamless coordination across teams supported delivery of the project.
The manufacturing and installation programme was fast-tracked to meet the project’s strict timescale.
The original case study records positive feedback from Scottish Water Business Stream and consultants.
Manufactured to project requirements and delivered within the agreed programme.
Common Questions
Frequently Asked Questions
How did Tricel Water meet the tight Murrayfield Stadium project deadline?
The project required only weeks to design, manufacture and install both tanks. Tricel Water used rapid design approval and DWG updates, fast-tracked manufacturing and installation, and streamlined coordination across the project teams. Both tanks were successfully installed ahead of deadline.
Why was full manufacturing control important for this project?
The client specifically required a supplier with full manufacturing control and the ability to support detailed technical submissions. This formed part of the requirements for delivering the two large GRP sectional tanks within the project programme.
How was design coordination managed across multiple stakeholders?
The project involved multiple stakeholders and consultant offices requiring updated designs. Mott MacDonald provided design support through its Manchester and Aberdeen offices, while rapid DWG updates and streamlined communication supported coordination across the teams.
Why was the 5 November 2025 deadline important?
A major stadium event was scheduled for 5 November 2025. The client therefore required guaranteed readiness before that date, making programme certainty a key project requirement. Both tanks were installed ahead of the deadline.
What made the procurement process challenging?
The original case study identifies a competitive tender environment and contractual risk among the project challenges. The delivery commitment could only be made once the client confirmed the order, while the overall project was tendered through Scottish Water Business Stream.
What technical support formed part of Tricel Water’s solution?
The project solution included rapid design approval and DWG updates. The client had also required a supplier capable of supporting detailed technical submissions.
What results were achieved despite the fast-track programme?
The original case study records three key results: delivery ahead of deadline, full compliance with safety and performance standards, and positive feedback from SWBS and consultants.
What did the client say about Tricel Water’s involvement?
The case study records client feedback that Tricel’s involvement from the design stage helped ensure quality and timely delivery.
About Scottish Water Business Stream
Scottish Water Business Stream is one of the UK’s most experienced water retailers and was the first to operate in the competitive water market. Based in Edinburgh, Business Stream provides water and wastewater services to businesses across the UK and was responsible for tendering the Murrayfield Stadium water storage project.
ABOUT TRICEL WATER & PUMPS
Tricel Water manufactures WRAS-approved GRP cold water storage tanks, including sectional, one-piece and fire sprinkler tanks, for projects across the UK and Ireland. With over 50 years of experience, Tricel Water supports infrastructure, industrial, high-rise and public-sector applications, providing engineered water storage solutions from design and manufacture through to installation.
CONTENTS
Free Download
Potable Water Storage Tanks at Murrayfield Stadium, Edinburgh
See how Tricel Water designed, manufactured and installed two 11m × 3m × 3m GRP sectional potable water storage tanks at Murrayfield Stadium within a demanding project programme.