50 Custom One-Piece GRP Water Tanks for J. Pao & Co. Ltd

Tricel Water manufactured and installed 50 custom one-piece GRP cold water storage tanks for J. Pao & Co. Ltd’s new food production facility. Designed to meet strict hygiene requirements, restricted internal access and specific maintenance needs, each WRAS-approved tank was manufactured to exact dimensions and incorporated dual manways for safe and easy access.

Project Details

50 custom One-piece Tanks in a Food and Agriculture Facility

Dimensions

2000 × 1200 × 1100mm

No. of Tanks

50

Tank construction

One-Piece GRP

Installation

Restricted Internal Access

Assembly

One-Piece Construction

Client

J. Pao & Co. Ltd

Contractor

Tricel Water

Published
Sector

Food Production & Agriculture

Location

United Kingdom

Reading Time

Approx. 6 minutes

Summary

Tricel Water manufactured and installed 50 bespoke one-piece GRP water tanks for J. Pao & Co. Ltd’s new food production facility.

The project required a water storage solution capable of meeting strict food-grade hygiene requirements while addressing a tight construction programme, restricted internal access and specific long-term maintenance needs.

Each tank was manufactured to exact dimensions of 2000 × 1200 × 1100mm, using WRAS-approved, corrosion-resistant GRP. Dual manways were incorporated into every tank to improve access for inspection, cleaning and maintenance.

Tricel’s sales, technical and engineering teams worked closely with J. Pao throughout the specification, design and delivery phases. Deliveries were strategically phased around the construction programme, enabling all 50 tanks to be delivered and installed on schedule.

The tanks are now fully integrated into the new facility’s operations, with highly positive client feedback on the design, delivery and performance of the solution.

Project Information

At a Glance

Client

J. Pao & Co. Ltd is a UK food producer specialising in the production and distribution of fresh bean sprouts. The company had previously partnered with Tricel Water, formerly Dewey Waters Ltd., and returned for this project following a consistently positive experience.

Industry

Food Production and Agriculture. The project required water storage suited to the hygiene, operational and maintenance demands of a food-grade production environment.

Contractor

Tricel Water manufactured and installed all 50 custom one-piece GRP water tanks and provided design consultation throughout the specification and delivery phases.

Tank Dimensions

Each of the 50 tanks was manufactured to custom dimensions of 2000 × 1200 × 1100mm.

Project

Manufacture and installation of 50 custom one-piece GRP cold water storage tanks for J. Pao & Co. Ltd’s new food production facility.

Challenge

A tight timeline, restricted internal access, strict hygiene requirements and unique maintenance demands shaped the design and delivery of the project.

Timeline

Summer 2025 – The facility build progressed towards completion.
Q3 2025 – Project completion recorded.
Now – All 50 tanks are fully integrated into the new facility’s operations.

Current Project Status

All 50 tanks were successfully delivered, installed and integrated into the new food production facility.

Project Background

Engineering Water Storage Around a Modern Food Production Facility

Bringing J. Pao & Co. Ltd’s new food production facility online required a water storage system capable of supporting daily operations, hygiene requirements and long-term maintenance.

Tricel insulated water storage tanks installed in a food and beverage processing facility.

The brief called for 50 one-piece GRP cold water storage tanks, each manufactured to exact dimensions of 2000 × 1200 × 1100mm.

Site conditions added further complexity. Internal access points were limited, requiring precise design and delivery coordination. As a food-grade environment, the tanks also needed to meet WRAS requirements while remaining easy to clean and inspect.

Long-term operability and minimal downtime were also important considerations, requiring maintenance access to be incorporated into the tank design from the outset.

J. Pao had previously partnered with Tricel Water, formerly Dewey Waters Ltd. The company returned to Tricel for the new facility based on its previous experience and a relationship spanning over 30 years of reliable supply and service.

Delivery Approach

Tricel's Engineering and Delivery Approach

Tricel Water combined custom manufacturing, detailed design consultation and phased delivery to address the facility’s spatial, hygiene and maintenance requirements.

50 custom One-piece Tanks in a Food and Agriculture Facility

Bespoke GRP Tank Design

All 50 tanks were manufactured to exact custom dimensions of 2000 × 1200 × 1100mm, allowing the solution to accommodate the facility’s restricted internal access and layout constraints.

WRAS-Approved GRP Construction

Each tank was manufactured using WRAS-approved, corrosion-resistant GRP suitable for the food production environment and its hygiene requirements.

Dual Manways

Dual manways were incorporated into every tank specifically to address J. Pao’s hygiene and maintenance requirements. The design provides safer and more efficient internal access for routine inspection and cleaning while helping to minimise operational downtime.

Collaborative Design

Tricel’s sales, technical and engineering teams worked closely with J. Pao’s site engineers and contractors from the early planning stages through to installation.

Design consultations addressed spatial limitations, hygiene requirements and long-term maintenance needs, while tank configurations were adapted in response to real-time site feedback.

Phased Delivery

Deliveries were strategically phased to match the construction schedule.

Tricel coordinated deliveries from its UK manufacturing site as different areas of the facility became ready, supporting smooth integration of the tanks into the wider project.

The Brief

Understanding the Challenge

Delivering 50 custom GRP water tanks for the new food production facility required several project-specific challenges to be addressed.

Tight Timeline: The tanks needed to be manufactured, delivered and installed in line with the facility’s construction schedule.

Restricted Internal Access: Limited internal access points required precise tank design and delivery coordination.

Strict Hygiene Requirements: The food-grade environment required WRAS-approved tanks that could be readily cleaned and inspected.

Maintenance Requirements: Long-term operability and minimal downtime were essential, making ease of inspection, cleaning and maintenance an important part of the design.

High-capacity sectional water tank installation for food, beverage, and agricultural applications.

“We were impressed by Tricel’s ability to design tanks around our exact layout. The tanks are a central part of our new plant, and we’re very happy with the results.”

— Client Feedback, Andrew, J. Pao & Co. Ltd

Programme

Timeline

2025

The facility build progressed towards completion, with tank design, manufacture and delivery coordinated around the construction programme.

q3 2025

All 50 custom one-piece GRP water tanks were successfully delivered and installed on schedule.

NOW

All 50 tanks are fully integrated into the facility’s operations — supporting daily production and hygiene standards, with highly positive client feedback on design, delivery and performance.

Outcome

From Vision to Results: A Seamless Execution

On Time

All 50 custom-designed GRP water tanks were delivered and installed in line with the construction programme.

INTEGRATED

The tanks are fully integrated into the new facility and play a central role in supporting daily production and hygiene standards.

HYGIENIC

WRAS-approved GRP construction and dual manways address the hygiene requirements of the food production environment.

Accessible

Dual manways provide safer and more efficient internal access, simplifying routine inspection and cleaning while helping to minimise operational downtime.

QUALITY & DELIVERY

Client feedback praised the thoughtful design, reliable delivery and overall performance of the tanks.

PARTNERSHIP

Successful delivery strengthened a client relationship built on more than 30 years of reliable supply and service.

Common Questions

Frequently Asked Questions

How can one-piece water tanks be designed for restricted internal access?

On the J. Pao project, restricted internal access was addressed by manufacturing all 50 tanks to exact dimensions of 2000 × 1200 × 1100mm and coordinating their delivery with the site and construction programme.

Dual manways were developed specifically around J. Pao’s hygiene and maintenance requirements. They provide safer and more efficient internal access for inspection and cleaning while helping to minimise operational downtime.

Deliveries were strategically phased around the facility’s construction schedule. Tanks were dispatched from Tricel’s UK manufacturing site as different areas of the facility became ready.

Tricel’s sales, technical and engineering teams provided comprehensive design consultation addressing spatial restrictions, hygiene and maintenance needs. Communication continued throughout specification and delivery, with designs adapted to real-time site feedback.

The tanks were required for a food-grade production environment. The project therefore specified WRAS-approved GRP construction together with a design that supported cleaning and inspection.

Ease of maintenance was incorporated into the design. Each tank included dual manways to improve access for routine inspection and cleaning and help minimise operational downtime.

J. Pao had previously worked with Tricel Water, formerly Dewey Waters Ltd., and returned based on a consistently positive experience. The original case study records over 30 years of reliable supply and service between the companies.

About J. Pao & Co. Ltd

J. Pao & Co. Limited is a UK food producer founded in 1984, specialising in the production and distribution of fresh bean sprouts. Based in Dunstable, Bedfordshire, the company supplies retail, catering and food-processing markets across the UK.

About Tricel Water UK

Tricel Water manufactures WRAS-approved GRP cold water storage tanks, including one-piece, sectional and fire sprinkler tanks, for projects across the UK and Ireland. With over 50 years of experience, Tricel provides custom-engineered water storage solutions across commercial, industrial, residential and public-sector applications.

CONTENTS

Free Download

50 Custom One-Piece GRP Water Tanks for J. Pao & Co. Ltd

See how Tricel Water manufactured and installed 50 custom one-piece GRP cold water storage tanks for J. Pao & Co. Ltd’s new food production facility, overcoming restricted access, hygiene and maintenance challenges.

Explore Further

Guides, Standards & Resources

Every Tricel Water project draws on the same technical foundation. Use the resources below to see more real-world installations, check design and compliance detail, and download the documentation you need for your own specification.

sizing

Case Studies

Browse real installations across education, infrastructure, healthcare, high-rise and fire protection projects to see how our tanks solve site-specific challenges.

System design

Technical Guides

Step-by-step guidance on tank sizing, installation, cleaning & disinfection, and break tank & booster set design, written for engineers and site teams.

Compliance

Specification Guides

Ready-to-use clauses and design parameters for architects, consulting engineers and MEP contractors writing tanks into a project specification.

Commissioning

Standards & Compliance

Understand the regulations behind every installation, including BS EN 13280, the Water Supply (Water Fittings) Regulations, confined space and Legionella guidance.

Regulations

Certifications

Understand the regulations behind every installation, including BS EN 13280, the Water Supply (Water Fittings) Regulations, confined space and Legionella guidance.

Safety

Product Brochures

Download detailed brochures covering our sectional, one-piece, sprinkler and combined tank & pump station ranges to support your project planning.

The details in this case study were correct at the time of publishing and are provided as general guidance and for informational purposes only. They do not constitute engineering advice and should not be relied upon as the sole basis for design decisions. Always consult a qualified engineer and verify current specifications, standards and regulatory requirements before proceeding with your own project. © 2026 Tricel Water. All rights reserved.