Tricel Water Storage Solutions for the UK's Largest Infrastructure Project

Two bespoke 8m × 7m × 4m GRP sectional tanks, designed, manufactured and installed by Tricel Water for HS2’s Greatworth Green and Chipping Warden Green Tunnels – delivered on programme, with a third tank scheduled for early 2026.

Project Details

Dimensions

8m x 7m x 4m

No. of Tanks

2

Panel construction

Hot-Press Moulded GRP

Installation

External

Assembly

Assembled on-site

Client

HS2 Ltd

Contractor

EKFB Joint Venture

Published
Sector

Infrastructure

Location

United Kingdom

Reading Time

Approx. 6 minutes

Summary

Tricel Water designed, manufactured and installed two large GRP sectional water tanks (8m × 7m × 4m deep) for HS2’s Greatworth Green and Chipping Warden Green Tunnel sites, working alongside the EKFB Joint Venture (Eiffage, Kier Group, Ferrovial Construction and BAM Nuttall). Both tanks were delivered in 2025 with zero delays to HS2’s construction programme and are now in their final installation and sign-off phase. A third tank of the same specification is scheduled for installation in early 2026, continuing Tricel Water’s role in HS2’s Green Tunnel programme.

Project Information

At a Glance

Client

HS2 Ltd. – The UK’s flagship high speed rail project, transforming transport between London, Birmingham, Manchester, and Leeds while prioritising environmental and community sustainability.

Industry

Rail Infrastructure, Civil Engineering, and Construction

Contractor

EKFB Joint Venture – a collaboration between Eiffage, Kier Group, Ferrovial Construction, and BAM Nuttall

Tank Dimensions

8m x 7m x 4m deep (x2 installed; third planned for 2026)

Project

Tricel Water designed, manufactured, and installed two large GRP water tanks (8m × 7m × 4m) for HS2’s Greatworth Green and Chipping Warden Green Tunnel projects. A third tank is planned for early 2026, continuing Tricel Water’s key role in the Green Tunnel programme.

Challenge

HS2’s Green Tunnels programme required bespoke water storage infrastructure to support construction and long-term operations. Tight deadlines, rural site access, environmental commitments, and oversized components demanded exceptional engineering precision.

Timeline

2025 – First two tanks installed
2026 – Third tank scheduled

Current Project Status

Tanks in Final Installation Phase & Sign Off

Project Background

A Bespoke Water Storage Solution

HS2 is one of Europe’s largest infrastructure investments, aimed at delivering a high-speed rail link between London, Birmingham, Manchester, and Leeds, transforming UK transport and supporting sustainable growth.

infrastructure water storage solutions
infrastructure water storage solutions

The green tunnels programme is a unique element of HS2’s design. Unlike traditional bored tunnels, these cut-and-cover tunnels are constructed in open trenches before being covered over and landscaped to blend seamlessly into the surrounding countryside.

The Greatworth Green Tunnel and Chipping Warden Green Tunnel, each 2.5km long, are designed to:

Reduce the railway’s visual and noise impact.

Restore natural habitats and biodiversity.

Deliver a sustainable and community-sensitive rail corridor.

Delivery Approach

Tricel's Engineering and Delivery Approach

Tricel’s engineering, logistics, and installation teams collaborated closely with EKFB engineers to deliver a seamless, high-quality solution.

infrastructure water storage solutions
infrastructure water storage solutions

Bespoke GRP Tank Design

Tanks were designed to exact specifications, ensuring maximum capacity, durability, and compliance with HS2’s stringent engineering requirements.

Precision Logistics and Delivery

Transportation plans were created to deliver tank components to the rural construction sites with minimal disruption, ensuring adherence to HS2’s traffic and environmental management strategies.

On-Site Installation Expertise

Tricel’s installation teams deployed equipment and expertise to position and secure the tanks within restricted tunnel site areas, maintaining safety and efficiency throughout.

Sustainability Built-In

GRP construction ensures corrosion resistance, low maintenance requirements, and long-term durability, supporting HS2’s environmental objectives and lifecycle cost efficiency.

The Brief

Understanding the Challenge

Delivering water storage solutions for a project of HS2’s scale required addressing several challenges:

Large-Scale Engineering: Each tank’s dimensions (8m x 7m x 4m deep) brought unique challenges that encouraged creative solutions in manufacturing, delivery, and installation.

Restricted Site Access: Tunnels are in rural locations, requiring detailed logistics planning to transport large components.

Environmental Considerations: HS2’s strict sustainability commitments meant solutions had to align with environmental protection and long-term resilience standards.

Tight Construction Timelines: HS2’s extensive civil works programme leaves no room for delays; installations needed precision scheduling.

Future-Proofing: The tanks needed to serve immediate construction needs and remain functional for decades.

infrastructure water storage solutions

“Tricel Water’s expertise and precision delivery made this critical part of the HS2 Green Tunnel programme seamless and stress free.”

— Client Feedback, HS2 Green Tunnels Programme

Programme

Timeline

2025

Successful installation of two large tanks at Greatworth Green and Chipping Warden tunnels.

2026

Scheduled installation of the third tank to complete HS2’s Green Tunnel water storage infrastructure.

NOW

Tanks in final installation phase & sign off — supporting construction and long-term operational water storage.

Outcome

From Vision to Results: A Seamless Execution

On Time

Both tanks were delivered and installed seamlessly, with zero delays to HS2’s ambitious construction programme.

Enhanced

Site capabilities: the tanks provide essential water storage for construction and future operational requirements, supporting site safety and environmental management.

Proven

Expertise: this high-profile project demonstrates Tricel’s capability in delivering complex GRP water storage solutions for large-scale infrastructure.

Aligned

Sustainability integration: solutions align with HS2’s commitment to reducing environmental impact and integrating construction with natural landscapes.

Common Questions

Frequently Asked Questions

What did Tricel Water supply for the HS2 Green Tunnels programme?

Tricel Water designed, manufactured and installed two large GRP sectional water tanks, each measuring 8m x 7m x 4m deep, for HS2’s Greatworth Green Tunnel and Chipping Warden Green Tunnel sites. A third tank of the same specification is scheduled for installation in early 2026.

Tricel Water is supplying tanks to the EKFB Joint Venture — a collaboration between Eiffage, Kier Group, Ferrovial Construction and BAM Nuttall — the main contractor delivering the Greatworth and Chipping Warden Green Tunnels for client HS2 Ltd.

The Greatworth and Chipping Warden Green Tunnels are 2.5km cut-and-cover tunnels built in open trenches and landscaped over to reduce visual and noise impact and restore habitats. This construction method, combined with rural site access and strict environmental commitments, required bespoke, oversized GRP tanks that could be manufactured off-site and installed with minimal disruption.

Each tank measures 8m x 7m x 4m deep. Two have been installed as part of the 2025 phase, with a third of the same dimensions planned for early 2026.

The tanks are manufactured from GRP (glass reinforced plastic). GRP construction gives corrosion resistance, low maintenance requirements and long-term durability, supporting HS2’s environmental objectives and lifecycle cost efficiency for both construction-phase and long-term operational water storage.

The first two tanks at Greatworth Green and Chipping Warden are in their final installation phase and sign-off, having been delivered on time with zero delays to HS2’s construction programme. The third tank remains scheduled for 2026.

Key challenges included the large-scale engineering demands of oversized 8m x 7m x 4m components, restricted rural site access requiring detailed logistics planning, HS2’s strict environmental and sustainability commitments, tight construction timelines with no room for delay, and the need to future-proof the tanks for decades of operational use.

Tricel Water manufactures its GRP sectional and one-piece tanks at two UK sites: Tricel Weston in Weston-super-Mare, Somerset (operating since 1956, formerly Dewey Waters), and Tricel Lanark in Lanark, Scotland (formerly Nicholson Plastics).

About HS2 Ltd

High Speed Two Ltd (HS2) is a UK government-funded company, established in January 2009, tasked with designing, building and operating the UK’s new high-speed rail network. Its core mission is to connect major cities – starting with London to Birmingham – through fast, zero-carbon journeys, freeing up capacity on existing lines and spurring economic growth along its route. HS2 is responsible for the construction of tracks, bridges, viaducts, tunnels and stations, as well as environmental sustainability, safety, and integration with existing transport systems.

About Tricel Water UK

Tricel Water manufactures WRAS Regulation 4(1)a approved GRP cold water storage tanks — sectional and one-piece — from 45 litres to over 4,000,000 litres, compliant with BS EN 13280:2001 and the Water Supply (Water Fittings) Regulations 1999. With over 60 years of UK manufacturing heritage across two sites in Weston-super-Mare and Lanark, Tricel Water is specified by consulting engineers, MEP contractors and facilities managers throughout the UK, across infrastructure, healthcare, education, high-rise and industrial sectors.

CONTENTS

Free Download

Installation of Cold Water Storage Tanks for HS2

Tricel Water designed, manufactured, and
installed two large GRP water tanks
for HS2’s Greatworth Green and Chipping Warden
Green Tunnel projects.

Explore Further

Guides, Standards & Resources

Every Tricel Water project draws on the same technical foundation. Use the resources below to see more real-world installations, check design and compliance detail, and download the documentation you need for your own specification.

sizing

Case Studies

Browse real installations across education, infrastructure, healthcare, high-rise and fire protection projects to see how our tanks solve site-specific challenges.

System design

Technical Guides

Step-by-step guidance on tank sizing, installation, cleaning & disinfection, and break tank & booster set design, written for engineers and site teams.

Compliance

Specification Guides

Ready-to-use clauses and design parameters for architects, consulting engineers and MEP contractors writing tanks into a project specification.

Commissioning

Standards & Compliance

Understand the regulations behind every installation, including BS EN 13280, the Water Supply (Water Fittings) Regulations, confined space and Legionella guidance.

Regulations

Certifications

Understand the regulations behind every installation, including BS EN 13280, the Water Supply (Water Fittings) Regulations, confined space and Legionella guidance.

Safety

Product Brochures

Download detailed brochures covering our sectional, one-piece, sprinkler and combined tank & pump station ranges to support your project planning.

The details in this case study were correct at the time of publishing and are provided as general guidance and for informational purposes only. They do not constitute engineering advice and should not be relied upon as the sole basis for design decisions. Always consult a qualified engineer and verify current specifications, standards and regulatory requirements before proceeding with your own project. © 2026 Tricel Water. All rights reserved.